銷(xiāo)售咨詢(xún)熱線(xiàn)
15953126901
15153196527
行業(yè)動(dòng)態(tài) dongnews
企業(yè)案例 case

聯(lián)系我們

  • 聯(lián)系人:濟(jì)南燕翔鐵藝制品有限公司
  • 手機(jī):15953126901
  • 電話(huà):15153196527
  • 郵箱:785385551@qq.com
  • 地址:濟(jì)南市天橋區(qū)歷山北路黃臺(tái)不銹鋼市場(chǎng)3區(qū)317

鐵藝護(hù)欄安裝工藝從七個(gè)方面做起來(lái)

來(lái)源:http://m.4hut75.com 日期:2023-05-30 發(fā)布人: 瀏覽次數(shù):10
1、施工條件
1. Construction conditions
1.鐵藝預(yù)埋件已完成并驗(yàn)收合格。
1. The iron embedded parts have been completed and accepted as qualified.
2.鐵藝護(hù)欄成品驗(yàn)收合格,符合設(shè)計(jì)要求。
2. The finished iron guardrail has passed the acceptance and meets the design requirements.
3.現(xiàn)場(chǎng)施工水電供應(yīng)充足。
3. Adequate water and electricity supply for on-site construction.
2、施工準(zhǔn)備
2. Construction preparation
1.工具準(zhǔn)備:電焊機(jī)、焊條、角磨機(jī)、刷子、鋼卷尺、切割機(jī)、水平尺。
1. Tool preparation: electric welding machine, welding rod, angle grinder, brush, steel tape measure, cutting machine, level ruler
2.材料準(zhǔn)備:符合設(shè)計(jì)要求的成品護(hù)欄、設(shè)計(jì)要求的油漆。
2. Material preparation: Finished guardrails that meet the design requirements, and paint that meets the design requirements.
3. Construction Technology of Jinan Iron Art Guardrail
基層處理:清理護(hù)欄表層垃圾、露出預(yù)埋件預(yù)埋位置。
Grassroots treatment: Clean the surface garbage of the guardrail and expose the embedded parts and positions.
定位標(biāo)高控制:根據(jù)設(shè)計(jì)要求將護(hù)欄安裝位置、標(biāo)高標(biāo)出并做好記號(hào)。
Positioning elevation control: Mark and mark the installation position and elevation of the guardrail according to the design requirements.
固定焊接:根據(jù)做好的位置、標(biāo)高記號(hào)進(jìn)行固定并焊接或用膨脹螺絲固定。
Fixed welding: Fix and weld according to the prepared position and elevation marks, or fix with expansion screws.
修整磨平:焊接好后需進(jìn)行檢查,將焊口打磨光滑并補(bǔ)平接口處小孔。
Dressing and smoothing: After welding, it is necessary to inspect, polish the welded junction smooth, and fill the small holes at the interface.
4、注意事項(xiàng)
4. Precautions
1.成品護(hù)欄應(yīng)符合設(shè)計(jì)要求,經(jīng)驗(yàn)收合格后才能進(jìn)場(chǎng)施工。
1. The finished guardrail should meet the design requirements and can only be mobilized for construction after passing the acceptance inspection.
2.焊接點(diǎn)有打磨無(wú)法處理平整的及接口處有小孔的,需用原子灰密實(shí)以防進(jìn)水后生銹。
2. If the welding points are polished and cannot be processed smoothly, and there are small holes at the interface, atomic ash should be used to compact them to prevent rusting after water ingress.
3.連接部位需打磨光滑,刷兩道防銹漆,經(jīng)驗(yàn)收后再做表面一致處理。
3. The connecting parts need to be polished smooth, coated with two coats of rust resistant paint, and then subjected to surface consistency treatment after acceptance.
濟(jì)南鐵藝護(hù)欄
4.焊接時(shí)應(yīng)滿(mǎn)焊,禁止點(diǎn)焊。
4. During welding, full welding should be carried out and spot welding is prohibited.
5.已安裝完成的護(hù)欄上不得涂抹砂漿及掛放雜物。
5. The installed guardrail shall not be coated with mortar or hung with debris.
5、濟(jì)南鐵藝護(hù)欄質(zhì)量要求
5. Jinan Iron Art Guardrail Quality Requirements
1.成品護(hù)欄規(guī)格、質(zhì)量、外形符合設(shè)計(jì)要求。
1. The specifications, quality, and appearance of the finished guardrail meet the design requirements.
2.安裝位置、標(biāo)高正確,滿(mǎn)足設(shè)計(jì)要求。
2. The installation position and elevation are correct and meet the design requirements.
3.與預(yù)埋件連接牢固,無(wú)松動(dòng)、斷裂現(xiàn)象。
3. Connect firmly to the embedded parts without looseness or breakage.
4.護(hù)欄高度、護(hù)欄間距符合設(shè)計(jì)要求。
4. The height and spacing of guardrails meet the design requirements.
5.焊口平滑、焊縫均勻,且需經(jīng)過(guò)防銹處理。
5. The welding seam is smooth, the weld seam is uniform, and needs to undergo rust prevention treatment.
6、驗(yàn)收標(biāo)準(zhǔn)
6. Acceptance criteria
1.護(hù)欄的尺寸、高度、間距、油漆顏色符合設(shè)計(jì)要求。
1. The size, height, spacing, and paint color of the guardrail meet the design requirements.
2.護(hù)欄直形部分橫平豎直、彎曲部分曲線(xiàn)順暢。
2. The straight part of the guardrail is horizontal and vertical, and the curved part is smooth.
3.焊口平滑、焊縫均勻,油漆品種、顏色與護(hù)欄一致。
3. The welding seam is smooth, the weld seam is uniform, and the paint type and color are consistent with the guardrail.
4.焊接牢固、無(wú)松動(dòng)。
4. The welding is firm and free from looseness.
7、后期養(yǎng)護(hù)維修
7. Post maintenance and repair
1.保持護(hù)欄清潔,遠(yuǎn)離酸堿或易腐蝕物品并經(jīng)常除塵。
1. Keep the guardrail clean, away from acids, alkalis, or corrosive substances, and regularly remove dust.
2.護(hù)欄除油一般可采用有機(jī)溶液沖洗等方法。
2. Generally, methods such as organic solution flushing can be used to remove oil from guardrails.
3.小面積除銹可用有機(jī)油清洗、抹擦。
3. Small areas of rust removal can be cleaned and wiped with engine oil.
4.護(hù)欄有松動(dòng)需重新焊接,焊接后需打磨、防銹刷漆處理。
4. If the guardrail is loose, it needs to be re welded. After welding, it needs to be polished, rustproof, and painted.
鐵藝護(hù)欄安裝工藝相關(guān)內(nèi)容就講解到這里了,希望對(duì)您有所幫助,更多事項(xiàng)就來(lái)我們網(wǎng)站http://m.4hut75.com咨詢(xún)!
That's all for the installation process of iron guardrails. I hope it can be helpful to you. For more information, please come to our website http://m.4hut75.com consulting service
主站蜘蛛池模板: 无码精品不卡一区二区三区| 日韩毛片无码永久免费看| 无码137片内射在线影院 | 亚洲国产精品无码一线岛国| 亚洲精品无码专区久久同性男| 国产精品99久久久精品无码| 亚洲精品GV天堂无码男同| 国产丝袜无码一区二区三区视频 | 亚洲AV无码成人网站久久精品大 | 97在线视频人妻无码| 大桥久未无码吹潮在线观看| 无码137片内射在线影院 | 国产午夜av无码无片久久96| 亚洲欧洲自拍拍偷午夜色无码| 亚洲日韩精品A∨片无码加勒比| 办公室丝袜激情无码播放| 亚洲av永久中文无码精品综合| 国产成人午夜无码电影在线观看| 国产精品无码素人福利免费| 91精品无码久久久久久五月天 | 无码熟妇人妻在线视频| 无码区国产区在线播放| 少妇无码AV无码一区| 久久精品无码中文字幕| 亚洲中文无码卡通动漫野外| 无码av免费网站| 亚洲美免无码中文字幕在线 | 亚洲看片无码在线视频| 亚洲国产精品无码专区在线观看 | 高清无码一区二区在线观看吞精 | 无码综合天天久久综合网| 亚洲中文字幕无码中文字| 91久久精品无码一区二区毛片| 超清无码一区二区三区| 波多野结AV衣东京热无码专区| 永久免费无码网站在线观看个| 欧美性生交xxxxx无码影院∵| 中文无码精品A∨在线观看不卡| 日韩爆乳一区二区无码| 精品爆乳一区二区三区无码av| 亚洲av日韩av无码黑人|